House: Photos: 9/9 - Porch & Electric & Ducts & A/C 9/11 - Electric Complete & Attic Ventilation 9/12 - Construction Crop Circles 9/15 - Drywall & Attic Stairs! 9/18 - Fixed Window, Fixed Floors 9/19 - Metal Things & New Windows 9/22 - A Little Carpentry & A Little Gas 9/23 - Bricks Arrive & More Concrete 9/24 - Water Pressure & A Spider Web 9/25 - Plumbing and Carpentry Facelifts 10/3 - Taping, Mudding & Bricking 10/6 - More brick & Garage Doors! 10/7 - Interior Doors & Painting! 10/9 - Interior Doors & Molding 10/10 - Doors & Molding Painted 10/14 - Cabinets Arrive & More Painting 10/17 - Marble Bathroom Countertops 10/21 - Fenceposts, Tile & Brick 10/23 - WOW! Incredible Changes! 10/24 - Kitchen Counters, Doorknobs and Closet Rods! 10/25 - Window Film Removed & Doorstops 10/27 - Carpet! Carpet! Carpet! 10/28 - Walkthrough, Kitchen Progress & Sprinklers! |
More
Brick, A Mailbox, More Tile and Fenceposts!! With only one week left before the final walkthrough, things are coming along rapidly. The front porch is nearly bricked, the brick mailbox is up, the marble arrived for the master spa bath and is installed, the tile is complete, save for the fireplace and the side entryway, and the fenceposts are up all around the back yard! There's also a spot of damage in the kitchen under the window bench. Mouse
over the pictures below for details and click for a larger image. Boss! The fence! The fence! Floor and bathroom tile, PLUS the marble for the master spa bath! Most of the tile in the house is covered with cardboard to protect it, I suspect, during costruction, so most of what you see in the floor tile pictures below is, sadly, cardboard. The last two pictures show some drywall damage in the kitchen and a vent just outside the master bedroom's had a good mash.
|
|||